01-01-2016, 10:31 AM
A 4x4 post at the 4 foot and 8 foot points on the wall, ground to roof with say 6 to 8 inches of the posts (PT) buried in the ground. Support 2x4s (8 feet long at 2 foot, 4 foot and 6 foot high. This will give you an area to screw OSB sheets to. Leaving a 4 foot opening. I would enclose the area above the 4 by 8 sheets with see through corrugated plastic siding/roofing. Leaving say a 2 foot area open for ventilation. This will allow enough daytime light in and keep the ammonia smell down. For the final opening I either like to put a 4x8 osb sheet on hinges or make a slider outta it and put it on rails. I then cut a doggy sided cut out of the door. This keeps even more weather out but still allows me easy access to get inside. I will take a picture of my stand alone 12x24 shelter and show what I mean